Munster Joinery, Wellesbourne, UK

PROJECT LOCATION: Munster Joinery, Wellesbourne, UK Project Details This project involved all site clearance, excavation and removal of 26000m3 of excess material, laying 22500m2 of reinforced concrete with K-form joints. We also installed ducting, cabling, lighting, security cameras, fire main and valves/hydrants and other services. The drainage to this area was done using channels, twinwall […]

A6, Castledawson, N. Ireland

PROJECT: A6 Castledawson to Randalstown Dualling SchemePROJECT OPERATOR: Department of InfrastructurePROJECT LOCATION: Castledawson to RandalstownPROJECT SIZE: 14.7km of dual carriagewayPROJECT COST: £160mPROJECT DATE: November 2016 – Current https://youtu.be/6WeZRTGFVmQ Project Details Our works consisted of the construction of approximately 5km of dual carriageway including all drainage works plus preparation works for project structures.This included the bulk […]

Kilgallioch Windfarm, South Ayrshire, Scotland

LOCATION: Sunderland, UKCONTRACT: Various Road UpgradesAPPROXIMATE VALUE: €1.2m https://youtu.be/7iCUg4mxdsQ Project Details Kilgallioch Windfarm in South Ayrshire, Scotland was commissioned by Scottish Power Renewables at a cost of £300 million. This project consisted of 96 turbines. Our section of this project contained 25no turbines with all associated works which included initial site clearance, setting up compound, […]

University of Stirling, Scotland, UK

LOCATION: Stirling, Scotland, UK CONTRACT: September 2018 – February 2019 Project Details Sept 2018 – Feb 2019 This prestigious project consisted of the replacement of 6.5km watermain on campus, ranging from 38mm – 315mm diameter. This watermain was successfully installed on campus roadways, grassed areas and landscaped areas, while ensuring the University of Stirling campus […]

Mynyndd Y Gwair Windfarm, South Wales, UK

PROJECT: Mynyndd Y Gwair WindfarmWINDFARM OPERATOR: InnogyPROJECT LOCATION: South Wales, UKPROJECT SIZE: 16 TurbinesPROJECT COST: £52mPROJECT DATE: February 2018 – April 2019 https://youtu.be/7OKx37NOkZI Project Details Our works included the construction of 3km of enabling works entrance road from existing public road continuing through agricultural fields to the windfarm workface.  Constructing a total of approx 10km of […]